CityIA
Posted
Oct 7, 2026
Oct 20, 2026
Replace Outfield Padding at Veterans Memorial Stadium RFP
Replace outfield padding.
Description: Replacement of all above-ground sanitary and vent piping on the East side of Jordan-Hare Stadium.
HigherEducation · AL, US
Solicitation files and supporting documents for this bid.
RFP documents aren’t available here yet.
Our team can help you find the original solicitation documents.
Request File RetrievalDecision makers connected to this RFP from Auburn University.
Adjacent opportunities open for bidding right now.
CityIA
Posted
Oct 7, 2026
Oct 20, 2026
Replace outfield padding.
University Of Southern Mississippi
Higher EducationMS
Posted
Oct 5, 2026
Nov 3, 2026
The University of Southern Mississippi is seeking comprehensive, lump sum proposals from qualified waterproofing contractors for preparation, priming, and application of pedestrian traffic coating onto an existing concrete grandstand on the Lower West Level of Renasant Stadium.
CityOH
Posted
Oct 8, 2026
Nov 3, 2026
Work includes rehabilitation of approx. 107 LF of sanitary sewer main and 123 LF of sanitary sewer service laterals with LED-cured-in-place pipe, cleaning and televising of the sewers prior to lining to locate taps and remove roots, re-establish 2 active laterals to the main and re-establish 7 active side laterals to the service laterals, televising 107 LF of lined sanitary sewer main and 123 LF of lined sanitary sewer service laterals for verification, installation of 1 end of main sanitary cleanout, installation of 4 cleanouts over existing service laterals, installation of T-liner and hydro hat at 3 lateral to man interfaces, restoration, and related items.
CityOH
Posted
-
Nov 3, 2026
Work includes rehabilitation of approx. 5,225 LF of 8" through 10" sanitary sewer with a fold-and-form pipe lining system, minor to heavy cleaning and televising of 5,225 LF of sewer prior to lining to locate taps and remove roots, re-establishing 60 active laterals, televising 5,225 LF of lined sewer for verification, testing and grouting the laterals at the point of connection, lining 104 VF of concrete and brick/block sanitary manholes, lining 42.27 VF of steel manholes, restoration, and related items.