Construction of the Southwest Wastewater Pump Station and Force Main will be received by Harnett Regional Water. The project consists of one (1) contract with two (2) sections. Section A includes the upgrade of the existing SLS #57 sewer pump station including headworks modifications, replacement of two (2) existing 100 HP submersible pumps, new lime feed system, and electrical, SCADA, and controls. Section B includes the installation of 26,220 LF of 20” sewer force main, and all appurtenances. The project shall
include all sitework, piping, fittings, valves, appurtenances, and other items required.