CountyHI
Posted
Sep 23, 2026
Oct 22, 2026
Iao Valley Road Guardrail and Wall Replacement RFP
Replacing an existing roadside dry-stacked rock retaining wall with a concrete soil nail wall; replacing metal guardrail; paving roadway shoulders and underneath guardrails; cold planing and resurfacing of existing travelway; installing and replacing signage and pavement markings; installing vinyl picket fencing, grading for the soil nail wall; demolition of trees; relocation of trees; temporary relocation of overhead electrical lines; installation of a temporary utility pole; installing and replacing water service lateral and appurtenances; and installing temporary BMPs and erosion control measures.
