Closing soonPender County US 421 CFPUA Interconnect
Description: Construction of approx 1,023 LF of 12" PVC water line RJ, 358 LF of 12" DIP water line RJ, 12 LF of 8" DIP water line RJ, 9 EA of 12" gate valves, 2 EA of 8" gate valves, and 3,300 LB of RJ fittings. Work includes 2 EA connections to the existing 12" waterline, 137 LF of 24" casing by bore & jack, 1 LS flow meter vault, 1 LS automatic control valve vault, 1 LS double check valve vault, 1 EA fire hydrant, 2 EA sampling stations, 2 EA temporary booster pump connections, 591 LF of fence and gates, 900 SY of gravel driveway, 127 SY of paved driveway, 1 LS 15" culvert, 42 LF of asphalt repair, electrical work, traffic control, and erosion control.