CityMD
Posted
Sep 28, 2026
Nov 5, 2026
WWTP Sludge Pad Replacement - BPM059052
Provide removal and replacement of the existing sludge pad.
Description: Work in Area 440 includes: Construct sludge storage tanks and odor control system; install new sludge and sump pumps, instruments, and piping in existing Areas 420 and 530; structural modifications for new room separation and entrances in Area 420; demolish existing chlorine building, portions of structure, equipment and piping in Areas 420 and 530, and WAS pumps in Area 340; excavation, shoring, dewatering, and pile installation in Area 440; install electrical equipment, heating, ventilation, and air conditioning improvements; repair existing structures.
City · WA, US
Solicitation files and supporting documents for this bid.
Adjacent opportunities open for bidding right now.
CityMD
Posted
Sep 28, 2026
Nov 5, 2026
Provide removal and replacement of the existing sludge pad.
CountyCO
Posted
-
Oct 27, 2026
Boulder County Building Services is requesting bids to replace a 10,000-gallon aboveground fuel tank at 286 Ridge Road in Nederland. The new tank will be a 10,000-gallon UL-2085 tank divided between unleaded fuel and diesel. The work also includes a new concrete slab and protective bollards, followed by demolition of the existing slab and repaving.
School DistrictMN
Posted
Sep 29, 2026
Nov 5, 2026
Work consists of approx. the removal of existing underground fuel storage tanks, dispensers, fuel piping, and associated equipment, and the installation of a new fleet fueling system. includes two new 15,000-gallon double-wall fiberglass underground storage tanks for gasoline and diesel fuel, new fuel dispensers, double-wall underground fuel piping, tank monitoring and leak detection systems, and Stage I vapor recovery for the gasoline tank. The project also includes demolition, excavation, pavement restoration, concrete improvements, and related site work necessary to support the new fueling infrastructure. Add Alternates include the installation of a canopy over the fuel dispensing area and the addition of a 3,000-gallon 91-octane non-oxygenated gasoline storage tank with integrated fuel management controls.
CityTX
Posted
Sep 18, 2026
Oct 21, 2026
Work includes 1000 CY extra hand excavation; 1000 CY extra placement of granular fill, incl. Haul off of material; 1000 CY extra cement stabilized sand; 100 CY extra replacement of backfill material; 100 CY extra machine excavation, incl. Haul off of material; 20 LF extra 8-inch diameter sewer forcemain by open-cut (ductile iron w/restrained joints); 50 tn extra ductile iron fittings; 1000 CY "extra concrete paving (11-in depth)"; 1 ea 8-ft dia. Bypass manhole structure as detailed in the drawings. Including all piping, coatings, fittings, valve, conc. Top w/ access hatch, painting, and all appurtenances, all depths, complete in place. (sheet 254) etc. See attached file.
Decision makers connected to this RFP from City of Bellingham.