FederalDC
Posted
Oct 16, 2026
Oct 30, 2026
Description: The U.S. Geological Survey EESC-S.O. Conte Research Laboratory seeks the purchase and installation of a new walk-in cooler/freezer and removal of the existing unit in Turner Falls, Massachusetts. Delivery and installation must be completed within 30 days after the contractor receives the purchase order, with no option periods. This competitive request for quotations is a total small-business set-aside.
Federal · DC, US
Original attachments and procurement documents tied to this bid.
Federal RFP files are for Starbridge customers only.
You can request RFP files from all other buyer types for free on this site.
Decision makers connected to this RFP from Departmental Offices.
Adjacent opportunities open for bidding right now.
FederalDC
Posted
Oct 16, 2026
Oct 30, 2026
The U.S. Geological Survey EESC-S.O. Conte Research Laboratory seeks the purchase and installation of a new walk-in cooler/freezer and removal of the existing unit in Turner Falls, Massachusetts. Delivery and installation must be completed within 30 days after the contractor receives the purchase order, with no option periods. This competitive request for quotations is a total small-business set-aside.
School DistrictTN
Posted
-
Oct 20, 2026
Item 1: walk-in combination cooler/freezer manufacturer: thermo-kool, or alternate model #: q46979-25.
Posted
Oct 7, 2026
Oct 19, 2026
The Contractor shall perform the following, including but not limited to: Schedule and coordinate all work with the VA COR, Utilities Supervisor, and Chief of Maintenance and Operations prior to commencing work. Obtain a Hot Work Permit as necessary through VA Connecticut Healthcare System Safety and Occupational Health Service prior to beginning any hot work activities. Protect all equipment in place during replacement activities. Furnish and install cylinders, fittings, hangers, new tubing, piping, and insulation as required. Furnish and install IRP heat cable and electrical support for 240V heat cable. See attached file.
CityCO
Posted
Sep 29, 2026
Oct 28, 2026
Work includes approx 245 LF 8" VCP to 8" PVC pipe remove and replace; 1 LS bypass pumping; 761 LF 6" VCP pipe to 8" SDR26 PVC pipe; 488 LF remove and replace asphalt patch.