TREASURE ISLAND STORMWATER UTILITY AND RIGHT-OF-WAY IMPROVEMENTS RFP
Professional design services for stormwater, roadway, resiliency, and right-of-way improvements.
Description: Work consists of 1 LS Project Temporary Traffic Control; 1,280 CY Excavation, Embankment and Grading, Incl. Haul; 1,150 TN Crushed Surfacing Base Course; 1,150 SY Crushed Surfacing Repair; 380 LF Storm Sewer Pipe, 12" Diam; 2 EA Adjust Manhole; 1,590 LF Cement Conc. Traffic Curb and Gutter; 1,160 LF Paint Line.
City · WA, US
Original attachments and procurement documents tied to this bid.
Decision makers connected to this RFP from City of Grand Coulee.
Adjacent opportunities open for bidding right now.
Posted
-
Nov 2, 2026
Professional design services for stormwater, roadway, resiliency, and right-of-way improvements.
CityCA
Posted
Oct 7, 2026
Oct 29, 2026
The City of Richmond is soliciting sealed electronic bids for safety improvements at Harbour Way and Wright Avenue under Section 130. The work includes paving, concrete, traffic signals, railroad coordination, and delineation in accordance with the project drawings, standard specifications, and special provisions. Bids are due through BidsOnline at 2:00 p.m. PDT on October 29, 2026; the posting requires a 10% bid bond and 100% payment and performance bonds.
Posted
Oct 12, 2026
Nov 12, 2026
Work includes 2 EA tree removal (4"-12" tiger palm), 2 EA tree removal (4"-12" java plum), 50 LF pipe culvert, hdpe, round, 24" s/cd, 300 LF pipe culvert, hdpe, round, 30" s/cd, 490 lf pipe culvert, hdpe, round, 42" s/cd, 7 EA concrete apron at structures, 1 EA concrete class I headwall, fdot index 430, w/sbdd exceptions, 1 LS outfall channel excavation, 6 in below invert, 1 ls pavement restoration, 247 SY sod, bahia. See attached file.
CountyMS
Posted
Oct 11, 2026
Nov 12, 2026
Work inlcudes intersection improvements include construction of roundabout, widening, overlay, striping, and some drainage work.