Installation of the 12,000-gallon Diesel Fuel Storage Tank for the standby generator engine. The Village furnished equipment shall consist of an aboveground, steel fuel storage tank with secondary containment by concrete encasement and appurtenances required for a complete system. Scope of work includes removal of existing failed 12,000-gallon ConVault tank. All materials to be demolished shall be disposed of legally off-site. The Village will be responsible for draining the existing diesel fuel from the tank prior to removal. Contractor shall include in their bid the costs needed to coordinate this effort with the Village. Contractor shall provide forty-eight (48) hours notice to the Village prior to demolition. Tank may be hauled away and disposed of legally off-site or demolished onsite for hauling. Contractor to provide all equipment, dumpsters, etc. required for disposal. Demolition may occur at or immediately adjacent to the tank's current location, as the Village does not intend to relocate or break the existing foundation. Tank demolition must not interfere with deliveries or plant operations.