CityPA
Posted
Oct 5, 2026
Nov 20, 2026
The Borough of Honesdale North Main Street Trail Development Project RFP
A public trail and park access development project that includes: the construction of several 6' wide asphalt trail spurs, at grade in existing mowed areas; metal benches on concrete pads; kiosk signage; aluminum fencing; picnic tables; trash receptacles; bollards; funding designation signage; a flag pole with concrete footing; tree plantings; curb cuts required erosion and sediment control best management practices; and the rehabilitation/repairs of an existing bridge (trellis) and installation of steel fencing.
