Metrolinx is inviting tenders to replace and upgrade snowmelt-system manifold pit piping and components at Agincourt, Milliken, and Unionville GO stations. The work includes replacing deteriorated components, refilling and testing the systems, and recommissioning them. Contractors must coordinate access and work sequencing with Metrolinx because the stations and railway remain active.
Metrolinx seeks two engineering consultants to conduct annual visual inspections of bridges on its corridors, divided into Packages A and B. The inspections will document the condition of bridges and their components in accordance with Transport Canada guidelines and inform Metrolinx’s State of Good Repair program. Proponents may bid on either or both packages, but Metrolinx intends to award each package to a different vendor.
Metrolinx seeks a qualified vendor to provide preventative elevator maintenance and ad-hoc repairs at its facilities in the East and West regions and at Union Station. The work includes planned maintenance and responses to service requests at designated GO Transit locations. The services are intended to support reliable transit operations, safe access, and year-round accessibility.
Thorncliffe Park Construction Liaison Committee Meeting Summary
Date: Aug 27, 2026Type: Meeting mention
The meeting focused on providing construction updates for three Ontario Line contracts. Discussions covered the progress on the elevated guideway and stations by Trillium Guideway Partners, including pile drilling and utility relocation plans. Leaside Valley Builders provided updates on the West Don Crossing, Don Valley Crossing, and Beth Nealson Underpass. Connect6ix detailed the construction of the traction power substation for the Operations, Maintenance and Storage Facility.
Metrolinx Board Of Directors Board Of Directors Meeting
Date: Sep 10, 2026Type: Meeting mention
The board reviewed various operational and administrative updates, including responses to public correspondence on service quality, accessibility, and transit noise. Key discussions focused on rail safety initiatives, the procurement of new transit vehicles, and the organization's adherence to regional procurement guidelines. The CEO provided reports on ridership performance during major events, the status of fair evasion enforcement, and temporary service adjustments. Additionally, the meeting addressed the findings of a derailment investigation and reviewed safety audits of critical station infrastructure.
Exhibition Community Liaison Committee Meeting Minutes
The meeting included project progress updates for the Ontario Line at Exhibition Station and Ordnance Park, highlighting ongoing structural steel work. Key discussion items centered on community impact mitigation, specifically regarding truck traffic routes, dust management, and street sweeping schedules. Participants addressed resident concerns about overnight noise generated by hauling operations and discussed the upcoming installation of a muck pit roof as a noise reduction measure. Further dialogue addressed issues involving bird access at local properties and the potential relocation of truck staging to Exhibition Place to minimize noise and idling impacts on local streets.
Extracted from official board minutes, strategic plans, and video transcripts.
Meeting signals
Know what buyers discuss before RFPs drop
Track Metrolinx meetings, strategic plans, and budget discussions before the public bid appears.